Application Requirements
Notice of Intent to File Petition
Landowner Application or District Resolution [Sample]
Project Information Form Sample
Landowner Signatures and Agent Designation Form
- All owners of each parcel must sign. Original signatures are required. All signatures must be dated within the first six months of the first signature obtained.
Disclosure of Gifts to LAFCO Commissioners
- Initial fee deposit equal to half of LAFCO fees are due at the time an application is submitted.
Preliminary Descriptive Map (Either 8½" or 11" x 17" format)
Final Application Requirements:
Environmental Review
- California Environmental Quality Act Requirements
Service Plan Applicant Guidelines
Maps:
♦ 4 copies, full size
♦ 2 copies, 8 1/2" x 11"
♦ 2 copies Legal Description
BOE Sample Map & Geographic Description
All maps must be approved and signed by the County Surveyor's Office and meet State Board of Equalization requirements. Contact the El Dorado County Surveyor's office directly at (530) 621-5440.
Fees:
The second deposit is due with the final application requirements. LAFCO will bill until the project is closed.